程 昊,王红军,杨俊峰,张明亮.面向生产线全生命周期的数字孪生模型应用[J].电子测量与仪器学报,2023,37(4):115-121
面向生产线全生命周期的数字孪生模型应用
Application of digital twin model for the whole life cycle of production line
  
DOI:
中文关键词:  数字孪生  全生命周期  仿真预演  连通调试  状态监控
英文关键词:digital twin  full life cycle  simulation rehearsal  connection commissioning  status monitoring
基金项目:国家自然科学基金(51975058) 项目资助
作者单位
程 昊 1. 北京信息科技大学机电工程学院 
王红军 1. 北京信息科技大学机电工程学院,2. 高端装备智能感知与控制北京市国际科技合作基地 
杨俊峰 1. 北京信息科技大学机电工程学院 
张明亮 3. 北京无线电测量研究所 
AuthorInstitution
Cheng Hao 1. School of Mechanical Electrical Engineering, Beijing Information Science & Technology University 
Wang Hongjun 1. School of Mechanical Electrical Engineering, Beijing Information Science & Technology University,2. Beijing International Science Cooperation base of High-End Equipment Intelligent Perception and Control 
Yang Junfeng 1. School of Mechanical Electrical Engineering, Beijing Information Science & Technology University 
Zhang Mingliang 3. Beijing Institute of Radio Measurement 
摘要点击次数: 1344
全文下载次数: 1373
中文摘要:
      针对传统生产方式存在的管理成本大,生产效率低的问题,为实现智能化生产,设计了基于数字孪生技术的生产线全生 命周期管理应用框架。 首先基于物理生产线的多元数据,通过建模技术构建了生产线数字孪生模型,分别从生产线的规划阶 段、调试阶段、运行阶段,为物理实体生产线提供仿真预演分析、连通调试、生产状态监控、数据可视化等服务。 通过孪生模型对 实际生产线的规划到运行阶段进行指导和改进,使企业生产线平衡率提高了 6. 84%,年产量增加了 792 件,结果表明该方法 有效。
英文摘要:
      Aiming at the problems of high management cost and low production efficiency in traditional production methods, in order to realize intelligent production, the application framework of production line lifecycle management based on digital twinning technology is designed. First, based on the multiple data of physical production line, the digital twinning model of production line is built through modeling technology, including the planning stage, commissioning stage and operation stage of production line, provide simulation preview analysis, connection debugging, production status monitoring, data visualization and other services for the physical entity production line. The twin model was used to guide and improve the planning and operation of the actual production line. The balance rate of the production line increased by 6. 84% and the annual output increased by 792 pieces. The results showed that the method was effective.
查看全文  查看/发表评论  下载PDF阅读器